LSSB Sizing Simulator

LSSB Sizing Simulator

Energy and sizing layer for one lift or a lift group. Pick the lift, building and location; the model generates the traffic profile, sizes PV, battery and converter, and compares energy and cost before and after LSSB.

Lift specification

Building

Location

Sizing

Outage scenario

Cost assumptions

Midpoints of the Level 1 BOM at single-unit retail prices (Nov 2026), converted from Singapore dollars. The smallest converter frame is the shortlisted 30 kVA unit. The ARD + EBOPS credit is an earlier estimate, not a BOM figure. Replace with vendor quotes. Battery, converter, fixed items, installation and the credit apply once per lift; PV is shared across the group.

Recommended PV
Recommended battery
Converter rating
Simple payback

Energy and cost, before and after

Per yearBeforeAfter LSSBChange

Design checks

    Tier comparison

    R: RescueC: ContinuityS: Solar

    Weekday traffic profile

    Starts per hour for the whole group, generated from the building type.

    Weekday power flows

    Hourly average kW. Peaks within a trip are checked separately.

    State of charge, one week

    Dashed line is the EPO threshold: homing energy plus car services reserve, above the 10% floor. Daily cycling stops higher, to keep the ride-through reserve.

    Outage ride-through

    Method: trip energy from counterweight imbalance (47% balance), kinetic energy and drive efficiency; average travel and car load follow the ISO 25745-2 usage-category approach. Checked against a measured 900 kg, 1.75 m/s, 10-stop office carpark lift in Singapore that used 14 to 25 kWh per day.

    Battery limits: the start peak is checked against the short-peak rating and the constant-speed run against the continuous rating, because a full-travel run outlasts a 10 s peak window.

    Lift groups: each lift has its own LSSB unit and only the PV array is shared. The energy simulation pools the group's batteries, which is exact only for identical lifts. Roof area assumes about 70 sq ft per kWp on a flat roof, including row spacing and access.

    Not modeled: the millisecond supply-transfer transient, battery aging, tariff time-of-use bands and demand charges. Tariffs other than Singapore are indicative and should be replaced with the customer's actual rate.